Course: HVA234 First Term: 2016 Spring
Final Term: Current
Final Term: 2021 Summer
|
Lecture 3 Credit(s) 3 Period(s) 3 Load
Credit(s) Period(s)
Load
Subject Type: OccupationalLoad Formula: S |
MCCCD Official Course Competencies | |||
---|---|---|---|
1. Review of specific trade codes related to heating, ventilation and air conditioning (HVAC) installation. (I)
2. Describe proper piping techniques for specific applications. (II) 3. Identify specific duct fittings. (III) 4. Explain the procedures for preparing a built-up roof to set a roof-curb. (IV) 5. Explain the procedures for setting a roof jack on a pitched roof . (V) 6. Calculate the pitch of a roof. (VI) 7. Calculate the wire size for a specific HVAC or refrigeration unit. (VII) 8. Select proper HVAC or refrigeration equipment based on design calculations. (VIII) 9. Explain the start-up procedure for specific equipment. (IX) 10. Calculate the pipe size for a specific site. (X) 11. Evaluate existing system versus proposed system and code updates. (XI) | |||
MCCCD Official Course Competencies must be coordinated with the content outline so that each major point in the outline serves one or more competencies. MCCCD faculty retains authority in determining the pedagogical approach, methodology, content sequencing, and assessment metrics for student work. Please see individual course syllabi for additional information, including specific course requirements. | |||
MCCCD Official Course Outline | |||
I. Codes
A. Electrical B. Mechanical C. Plumbing D. Building E. Local F. Utility II. Piping Techniques A. Size B. Trap(s) C. Insulation D. Brazing E. Soldering F. Nitrogen purge G. Support(s) H. Pitch III. Duct Fittings A. Transitions B. Converging C. Diverging D. Round E. Flex F. Round-oval IV. Roof Preparation A. Removing old roof B. Setting roof curb C. New roof V. Pitched Roof A. Setting jack B. Sealing opening VI. Roof Pitch A. Calculate B. Design roof jack VII. Wire Size A. Design criteria B. Manufacturer data VIII. Equipment Selection A. Tools B. Roof jacks C. Plenums D. Stands E. Welding equipment F. Soldering equipment G. Ducts H. Fittings IX. Equipment Start-up A. Electrical B. Mechanical C. Manufacturer data sheet X. Pipe Size A. Refrigeration lines B. Gas lines XI. System Evaluation A. Evaluate 1. old 2. proposed B. Code updates | |||
MCCCD Governing Board Approval Date: 2/26/2002 |