Course: CON215 First Term: 2020 Summer
Final Term: Current
Final Term: 9999
|
Lec + Lab 4.0 Credit(s) 5.0 Period(s) 5.0 Load
Credit(s) Period(s)
Load
Subject Type: OccupationalLoad Formula: T- Lab Load |
MCCCD Official Course Competencies | |||
---|---|---|---|
1. Install drywall per specifications. (I, II, IV)
2. Perform door installations per specifications. (I, II, VI) 3. Install stair systems per specifications. (I, II, VII) 4. Install trim per specifications. (I, II, VIII) 5. Practice Occupational Safety and Health Administration (OSHA), trade, and local safety standards in daily work. (I, IV-VIII) 6. Demonstrate efficient and quality work. (I-VIII) 7. Effectively communicate with stakeholders. (I-VIII) 8. Effectively work within a team structure. (I-VIII) 9. Demonstrate professionalism with conduct and ethics. (I-VIII) 10. Interpret specifications and drawings for interior finishes. (II) 11. Estimate the amount of material for interior finishes. (II, III) 12. Explain how to lay out and install a basic set of cabinets. (II, V) 13. Identify door types. (II, VI) 14. Identify the stair parts in various systems. (II, VII) 15. Identify types of trim. (II, VIII) 16. Identify the components of a drywall assembly. (IV) | |||
MCCCD Official Course Competencies must be coordinated with the content outline so that each major point in the outline serves one or more competencies. MCCCD faculty retains authority in determining the pedagogical approach, methodology, content sequencing, and assessment metrics for student work. Please see individual course syllabi for additional information, including specific course requirements. | |||
MCCCD Official Course Outline | |||
I. Safety standards
II. Interpreting specifications and drawings interior finishes III. Estimating material for interior finishes IV. Drywall assembly A. Components B. Installation V. Cabinet assembly layout VI. Door assembly A. Door type B. Frames C. Hardware D. Materials E. Installation VII. Stair assembly A. Components B. Types C. Installation VIII. Trim A. Types of trim B. Installation | |||
MCCCD Governing Board Approval Date: December 10, 2019 |