Course: FAC235LL First Term: 2018 Fall
Final Term: Current
Final Term: 2021 Fall
|
Laboratory 1.0 Credit(s) 3.0 Period(s) 3.0 Load
Credit(s) Period(s)
Load
Subject Type: OccupationalLoad Formula: T Lab Load |
MCCCD Official Course Competencies | |||
---|---|---|---|
1. Demonstrate proper duct traversing and diffuser air flow measurement techniques. (I)
2. Demonstrate proper water flow measurement techniques. (II) 3. Analyze water-side system performance and demonstrate hydronic balancing and circuit setter adjustment. (III) 4. Set up and test specific types of variable volume terminal units. (III, IV) 5. Formulate and practice chiller, cooling tower and pump testing procedures. (IV) 6. Plan and demonstrate duct heater testing processes, with special emphasis on safety considerations. (IV) 7. Plan and demonstrate testing procedures for package units, split systems and air and water source heat pumps. (IV) 8. Collect, record and analyze air and water system component performance data. (V) | |||
MCCCD Official Course Competencies must be coordinated with the content outline so that each major point in the outline serves one or more competencies. MCCCD faculty retains authority in determining the pedagogical approach, methodology, content sequencing, and assessment metrics for student work. Please see individual course syllabi for additional information, including specific course requirements. | |||
MCCCD Official Course Outline | |||
I. Air Measurement
A. Instruments 1. Pitot tube 2. Orifice 3. Hoods and velometers 4. Incline manometer B. Duct Traversing C. Data Recording II. Water Measurement A. Instruments 1. Venturi 2. Orifice 3. Fow meters 4. Differential pressure meters B. Data Recording III. Balancing Device Adjustments A. Air System 1. Fan 2. Dampers 3. Terminal units 4. Grills and registers B. Water System 1. Coils 2. Primary systems IV. Testing A. Air System 1. Fans 2. Terminal units 3. Duct heaters B. Water System 1. Pumps 2. Chillers 3. Cooling towers C. Unitary Systems 1. Package AC 2. Heat pumps 3. Split systems V. Report Writing A. Data Recording B. Report Creation | |||